Scan & Mark
Show us the hole. We mark what to miss.
When you show us where you want a hole drilled, we mark that location and scan the concrete around it. The goal is simple: no rebar, post-tension cable, conduit, or pipe in the cut. A palm antenna reaches tighter rooms and smaller slabs when a full cart will not fit.

What scan and mark includes
- Quick, accurate marks for rebar, conduits, pipes, and post-tension cables
- Slab thickness measurements
- Void and deterioration detection
- Works on slab-on-grade and suspended slabs
- One-sided access — no film on the ceiling below
- Palm antenna for confined spaces
Concrete scanning exists to map what is in the slab before construction starts. From rebar and post-tension cables to conduits and voids, a mark on the slab is faster — and safer — than hoping the drawings are right.
Need a same-day mark?
Call Tommy's GPR. We scan across Oklahoma and can usually tell you how soon a tech can be on site.
